Progression at Kimbolton Preparatory School -
- Triesse
- Oct 25, 2019
- 1 min read
The works shown are complete to the first fix stage (one sided only to allow for M&E works). In this process we have installed acoustic partitions and wall linings using British Gypsum Acoustuds & Sound Block F Plasterboard (partitions) along with Gypliner universal wall linings. Works were installed within the new build extension.